[1] M. P. Groover, Fundamentals of Modern Manufacturing:Materials, Processes, and Systems. Third edition. New Jersey, USA:John Wiley and Sons, Inc., 2007.
[2] P. Sivasankaran and P. Shahabudeen, "Literature review of assembly line balancing problems, " Int. J. Adv. Manuf. Technol., vol. 73, no. 9-12, pp. 1665-1694, Aug. 2014. https://www.deepdyve.com/lp/springer-journals/literature-review-of-assembly-line-balancing-problems-myOvxxWAux
[3] N. M. Z. N. Mohamed and M. K. Khan, "Decomposition of manufacturing processes: a review, " Int. J. Automot. Phys. Mechan. Eng., vol. 5, pp. 545-560, Jan. -Jun. 2012. https://doaj.org/article/142ea15abb25467c95577b6e57283958
[4] F. de P Hanika, "Mass production management, " Journal of the Operational Research Society, vol. 25, no. 2, pp. 330, 1974. doi: 10.1057/jors.1974.56
[5] X. C. Liu, K. Ji, O. El Fakir, H. M. Fang, M. M. Gharbi, and L. L. Wang, "Determination of the interfacial heat transfer coefficient for a hot aluminium stamping process, " J. Mater. Process. Technol., vol. 247, pp. 158-170, Sep. 2017. https://www.mendeley.com/research-papers/determination-interfacial-heat-transfer-coefficient-hot-aluminium-stamping-process/
[6] J. A. Brierley, C. J. Cowton, and C. Drury, "A comparison of product costing practices in discrete-part and assembly manufacturing and continuous production process manufacturing, " Int. J. Prod. Econ., vol. 100, no. 2, pp. 314-321, Apr. 2006. https://www.mendeley.com/research-papers/comparison-product-costing-practices-discretepart-assembly-manufacturing-continuous-production-proce/
[7] R. L. Tousain and O. H. Bosgra, "Market-oriented scheduling and economic optimization of continuous multi-grade chemical processes, " J. Process Control, vol. 16, no. 3, pp. 291-302, Mar. 2006. https://www.cheric.org/research/tech/periodicals/view.php?seq=533918
[8] L. X. Tang and G. S. Wang, "Decision support system for the batching problems of steelmaking and continuous-casting production, " Omega, vol. 36, no. 6, pp. 976-991, Dec. 2008. https://ideas.repec.org/a/eee/jomega/v36y2008i6p976-991.html
[9] K. Dhouib, A. Gharbi, and N. Landolsi, "Throughput assessment of mixed-model flexible transfer lines with unreliable machines, " Int. J. Prod. Econ., vol. 122, no. 2, pp. 619-627, Dec. 2009.
[10] O. Battaïa and A. Dolgui, "A taxonomy of line balancing problems and their solution approaches, " Int. J. Prod. Econ., vol. 142, no. 2, pp. 259-277, Apr. 2013. https://ideas.repec.org/a/eee/proeco/v142y2013i2p259-277.html
[11] D. A. Hounshell, From the American System to Mass Production, 1800-1932. Baltimore, Maryland, USA:Johns Hopkins University Press, 1984.
[12] Q. Zhang and M. M. Tseng, "Modelling and integration of customer flexibility in the order commitment process for high mix low volume production, " Int. J. Prod. Res., vol. 47, no. 22, pp. 6397-6416, Aug. 2009.
[13] L. E. Cárdenas-Barrón, "Economic production quantity with rework process at a single-stage manufacturing system with planned backorders, " Comput. Ind. Eng., vol. 57, no. 3, pp. 1105-1113, Oct. 2009. https://www.deepdyve.com/lp/elsevier/economic-production-quantity-with-rework-process-at-a-single-stage-z6qRKCESG0
[14] C. H. Lu and C. C. Tsai, "Adaptive decoupling predictive temperature control for an extrusion barrel in a plastic injection molding process, " IEEE Trans. Ind. Electron., vol. 48, no. 5, pp. 968-975, Oct. 2001. https://www.mendeley.com/research-papers/adaptive-decoupling-predictive-temperature-control-extrusion-barrel-plastic-injection-molding-proces/
[15] T. L. Chia, "Model predictive control helps to regulate slow processes-robust barrel temperature control, " ISA Trans., vol. 41, no. 4, pp. 501-509, Oct. 2002. https://www.mysciencework.com/publication/show/model-predictive-control-helps-regulate-slow-processes-robust-barrel-temperature-control-38870074
[16] S. N. Huang, K. K. Tan, and T. H. Lee, "Adaptive GPC control of melt temperature in injection moulding, " ISA Trans., vol. 38, no. 4, pp. 361-373, Nov. 1999. https://www.mendeley.com/research-papers/adaptive-gpc-control-melt-temperature-injection-moulding/
[17] Y. M. H. Ng, M. L. Yu, Y. Huang, and R. X. Du, "Diagnosis of sheet metal stamping processes based on 3-D thermal energy distribution, " IEEE Trans. Autom. Sci. Eng., vol. 4, no. 1, pp. 22-30, Jan. 2007. https://www.mendeley.com/research-papers/diagnosis-sheet-metal-stamping-processes-based-3d-thermal-energy-distribution-2/
[18] J. Song, S. Kim, Z. Y. Liu, N. N. Quang, and F. Bien, "A real time nondestructive crack detection system for the automotive stamping process, " IEEE Trans. Instrum. Meas., vol. 65, no. 11, pp. 2434-2441, Nov. 2016. https://www.mendeley.com/research-papers/real-time-nondestructive-crack-detection-system-automotive-stamping-process/
[19] F. Z. Oujebbour, A. Habbal, and R. Ellaia, "Optimization of concurrent criteria in the stamping process, " in Proc. 2013 Int. Conf. Industrial Engineering and Systems Management, Rabat, Morocco, 2013. https://www.mysciencework.com/publication/show/optimization-concurrent-criteria-stamping-process-7f07ed84
[20] J. A. Buzacott, "Automatic transfer lines with buffer stocks, " Int. J. Prod. Res., vol. 5, no. 3, pp. 183-200, Jan. 1967. https://www.mendeley.com/research-papers/automatic-transfer-lines-buffer-stocks/
[21] S. Masood, "Line balancing and simulation of an automated production transfer line, " Assembly Autom., vol. 26, no. 1, pp. 69-74, Jan. 2006. https://www.mendeley.com/research-papers/line-balancing-simulation-automated-production-transfer-line/
[22] S. Rostami, B. Hamidzadeh, and D. Camporese, "An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints, " IEEE Trans. Robot. Autom., vol. 17, no. 5, pp. 609-618, Oct. 2001. https://www.mendeley.com/research-papers/optimal-periodic-scheduler-dualarm-robots-cluster-tools-residency-constraints/
[23] N. Q. Wu and M. C. Zhou, "Analysis of wafer sojourn time in dual-arm cluster tools with residency time constraint and activity time variation, " IEEE Trans. Semicond. Manuf., vol. 23, no. 1, pp. 53-64, Feb. 2010. https://www.mendeley.com/research-papers/analysis-wafer-sojourn-time-dualarm-cluster-tools-residency-time-constraint-activity-time-variation/
[24] Y. Qiao, N. Q. Wu, and M. C. Zhou, "Petri net modeling and wafer sojourn time analysis of single-arm cluster tools with residency time constraints and activity time variation, " IEEE Trans. Semicond. Manuf., vol. 25, no. 3, pp. 432-446, Aug. 2012.
[25] C. R. Pan. Y. Qiao, N. Q. Wu, and M. C. Zhou, "A novel algorithm for wafer sojourn time analysis of single-arm cluster tools with wafer residency time constraints and activity time variation, " IEEE Trans. Syst. Man Cybern. Syst., vol. 45, no. 5, pp. 805-818, May 2015. https://www.mendeley.com/research-papers/novel-algorithm-wafer-sojourn-time-analysis-singlearm-cluster-tools-wafer-residency-time-constraints/
[26] F. J. Yang, N. Q. Wu, Y. Qiao, and M. C. Zhou, "Petri net-based optimal one-wafer cyclic scheduling of hybrid multi-cluster tools in wafer fabrication, " IEEE Trans. Semicond. Manuf., vol. 27, no. 2, pp. 192-203, May 2014.
[27] F. J. Yang, N. Q. Wu, Y. Qiao, and M. C. Zhou, "Petri net-based polynomially complex approach to optimal one-wafer cyclic scheduling of hybrid multi-cluster tools in semiconductor manufacturing, " IEEE Trans. Syst. Man Cybern. Syst., vol. 44, no. 12, pp. 1598-1610, Dec. 2014. https://www.mendeley.com/research-papers/petri-netbased-polynomially-complex-approach-optimal-onewafer-cyclic-scheduling-hybrid-multicluster/
[28] F. J. Yang, N. Q. Wu, Y. Qiao, and M. C. Zhou, "Optimal one-wafer cyclic scheduling of time-constrained hybrid multicluster tools via petri nets, " IEEE Trans. Syst. Man Cybern. Syst., vol. 47, no. 11, pp. 2920-2932, Nov. 2017. doi: 10.1109/TSMC.2016.2531697.
[29] F. J. Yang, N. Q. Wu, Y. Qiao, and M. C. Zhou, "Optimal one-wafer cyclic scheduling of hybrid multirobot cluster tools with tree topology, " IEEE Trans. Syst. Man Cybern. Syst., vol. 48, no. 2, pp. 289-298, Feb. 2018.
[30] Q. H. Zhu, N. Q. Wu, Y. Qiao, and M. C. Zhou, "Scheduling of single-arm multi-cluster tools with wafer residency time constraints in semiconductor manufacturing, " IEEE Trans. Semicond. Manuf., vol. 28, no. 1, pp. 117-125, Feb. 2015. https://www.mendeley.com/research-papers/scheduling-singlearm-multicluster-tools-wafer-residency-time-constraints-semiconductor-manufacturing/
[31] M. E. Salveson, "The assembly line balancing problem, " J. Ind. Eng., vol. 6, no. 3, pp. 18-25, Jan. 1955. https://www.mendeley.com/research-papers/assembly-line-balancing-problem-2/
[32] I. Baybars, "A survey of exact algorithms for the simple assembly line balancing problem, " Manage. Sci., vol. 32, no. 8, pp. 909-932, Aug. 1986. https://www.mendeley.com/research-papers/survey-exact-algorithms-simple-line-balancing-problem/
[33] T. S. Wee and M. J. Magazine, "Assembly line balancing as generalized bin packing, " Oper. Res. Lett., vol. 1, no. 2, pp. 56-58, Apr. 1982. https://www.mendeley.com/research-papers/assembly-line-balancing-generalized-bin-packing-3/
[34] S. G. Ponnambalam, P. Aravindan, and G. M. Naidu, "A comparative evaluation of assembly line balancing heuristics, " Int. J. Adv. Manuf. Technol., vol. 15, no. 8, pp. 577-586, Jul. 1999. https://www.mendeley.com/research-papers/comparative-evaluation-assembly-line-balancing-heuristics-3/
[35] A. Scholl and C. Becker, "State-of-the-art exact and heuristic solution procedures for simple assembly line balancing, " Eur. J. Oper. Res., vol. 168, no. 3, pp. 666-693, Feb. 2006. https://www.mendeley.com/research-papers/stateoftheart-exact-heuristic-solution-procedures-simple-assembly-line-balancing/
[36] J. R. Jackson, "A computing procedure for a line balancing problem, " Manage. Sci., vol. 2, no. 3, pp. 261-271, Apr. 1956. https://www.mendeley.com/research-papers/computing-procedure-line-balancing-problem/
[37] M. Held, R. M. Karp, and R. Shareshian, "Assembly-line balancing-dynamic programming with precedence constraints, " Oper. Res., vol. 11, no. 3, pp. 442-459, Jun. 1963. https://www.mendeley.com/research-papers/assemblyline-balancingdynamic-programming-precedence-constraints/
[38] A. Sprecher, "Dynamic search tree decomposition for balancing assembly lines by parallel search, " Int. J. Prod. Res., vol. 41, no. 7, pp. 1413-1430, May 2003. https://www.mendeley.com/research-papers/dynamic-search-tree-decomposition-balancing-assembly-lines-parallel-search/
[39] R. Klein and A. Scholl, "Maximizing the production rate in simple assembly line balancing——a branch and bound procedure, " Eur. J. Oper. Res., vol. 91, no. 2, pp. 367-385, Jun. 1996. https://www.mendeley.com/research-papers/maximizing-production-rate-simple-assembly-line-balancing-branch-bound-procedure/
[40] I. Kucukkoc and D. Z. Zhang, "Type-E parallel two-sided assembly line balancing problem: Mathematical model and ant colony optimisation based approach with optimised parameters, " Comput. Ind. Eng., vol. 84, 56-69, Jun. 2015. https://www.mendeley.com/research-papers/typee-parallel-twosided-assembly-line-balancing-problem-mathematical-model-ant-colony-optimisation-b/
[41] A. Scholl and S. Voß, "Simple assembly line balancing-heuristic approaches, " J. Heuristics, vol. 2, no. 3, pp. 217-244, Dec. 1997. https://www.mendeley.com/research-papers/simple-assembly-line-balancingheuristic-approaches/
[42] P. R. McMullen and G. V. Frazier, "Using simulated annealing to solve a multiobjective assembly line balancing problem with parallel workstations, " Int. J. Prod. Res., vol. 36, no. 10, pp. 2717-2741, Dec. 1998. https://www.mendeley.com/research-papers/using-simulated-annealing-solve-multiobjective-assembly-line-balancing-problem-parallel-workstations/
[43] A. C. Nearchou, "Balancing large assembly lines by a new heuristic based on differential evolution method, " Int. J. Adv. Manuf. Technol., vol. 34, pp. 9-10, pp. 1016-1029, Oct. 2007. https://www.mendeley.com/research-papers/balancing-large-assembly-lines-new-heuristic-based-differential-evolution-method/
[44] S. M. Davis, "From future perfect: Mass customizing, " Plan. Rev., vol. 17, no. 2, pp. 16-21, Dec. 1989. https://www.mendeley.com/research-papers/future-perfect-mass-customizing/
[45] D. Pollard, S. Chuo, and B. Lee, "Strategies for mass customization, " J. Bus. Econ. Res., vol. 6, no. 7, pp. 77-86, Jul. 2011. https://www.mendeley.com/research-papers/strategies-mass-customization/
[46] H. Tieng, C. F. Chen, F. T. Cheng, and H. C. Yang, "Automatic virtual metrology and target value adjustment for mass customization, " IEEE Rob. Autom. Lett., vol. 2, no. 2, pp. 546-553, Apr. 2017. https://www.mendeley.com/research-papers/automatic-virtual-metrology-target-value-adjustment-mass-customization/
[47] N. T. Thomopoulos, "Line balancing-sequencing for mixed-model assembly, " Manage. Sci., vol. 14, no. 2, pp. B59-B75, Oct. 1967. https://www.mendeley.com/research-papers/line-balancingsequencing-mixedmodel-assembly/
[48] M. Yazdani, M. Amiri, and M. Zandieh, "Flexible job-shop scheduling with parallel variable neighborhood search algorithm, " Expert Syst. Appl., vol. 37, no. 1, pp. 678-687, Jan. 2010. https://www.mendeley.com/research-papers/flexible-jobshop-scheduling-parallel-variable-neighborhood-search-algorithm/
[49] Y. Kara, U. Ozcan, and A. Peker, "Balancing and sequencing mixed-model just-in-time U-lines with multiple objectives, " Appl. Math. Comput., vol. 184, no. 2, pp. 566-588, Jan. 2007.
[50] H. Mosadegh, M. Zandieh, and S. M. T. F. Ghomi, "Simultaneous solving of balancing and sequencing problems with station-dependent assembly times for mixed-model assembly lines, " Appl. Soft Comput., vol. 12, no. 4, pp. 1359-1370, Apr. 2012. https://www.mendeley.com/research-papers/simultaneous-solving-balancing-sequencing-problems-stationdependent-assembly-times-mixedmodel-assemb/
[51] S. Akpinar and G. M. Bayhan, "A hybrid genetic algorithm for mixed model assembly line balancing problem with parallel workstations and zoning constraints, " Eng. Appl. Artif. Intell., vol. 24, no. 3, pp. 449-457, Apr. 2011. https://www.mendeley.com/research-papers/hybrid-genetic-algorithm-mixed-model-assembly-line-balancing-problem-parallel-workstations-zoning-co-1/
[52] A. Hamzadayi and G. Yildiz, "A genetic algorithm based approach for simultaneously balancing and sequencing of mixed-model U-lines with parallel workstations and zoning constraints, " Comput. Ind. Eng., vol. 62, no. 1, pp. 206-215, Feb. 2012. https://www.mendeley.com/research-papers/genetic-algorithm-based-approach-simultaneously-balancing-sequencing-mixedmodel-ulines-parallel-work/
[53] A. S. Simaria and P. M. Vilarinho, "2-ANTBAL: an ant colony optimisation algorithm for balancing two-sided assembly lines, " Comput. Ind. Eng., vol. 56, no. 2, pp. 489-506, Mar. 2009.
[54] B. Yagmahan, "Mixed-model assembly line balancing using a multi-objective ant colony optimization approach, " Expert Syst. Appl., vol. 38, no. 10, pp. 12453-12461, Sep. 2011. https://www.mendeley.com/research-papers/mixedmodel-assembly-line-balancing-using-multiobjective-ant-colony-optimization-approach/
[55] J. J. Bartholdi, "Balancing two-sided assembly lines: a case-study, " Int. J. Prod. Res., vol. 31, no. 10, pp. 2447-2461, Oct. 1993. https://www.mendeley.com/research-papers/balancing-twosided-assembly-lines-case-study/
[56] U. Özcan and B. Toklu, "A tabu search algorithm for two-sided assembly line balancing, " Int. J. Adv. Manuf. Technol., vol. 43, no. 7-8, pp. 822-829, Aug. 2009. https://www.mendeley.com/research-papers/tabu-search-algorithm-twosided-assembly-line-balancing/
[57] H. Gökçen, K. Ağpak, and R. Benzer, "Balancing of parallel assembly lines, " Int. J. Prod. Econ., vol. 103, no. 2, pp. 600-609, Oct. 2006. https://www.mendeley.com/research-papers/balancing-parallel-assembly-lines/
[58] U. Özcan, H. Gökçen, and B. Toklu, "Balancing parallel two-sided assembly lines, " Int. J. Prod. Res., vol. 48, no. 16, pp. 4767-4784, Aug. 2010. https://www.mendeley.com/research-papers/balancing-parallel-twosided-assembly-lines/
[59] D. Z. Zhang and I. Kucukkoc, "Balancing mixed-model parallel two-sided assembly lines, " in Proc. Int. Conf. Industrial Engineering and Systems Management, Rabat, Morocco, 2013. https://www.mendeley.com/research-papers/balancing-mixedmodel-parallel-twosided-assembly-lines/
[60] I. Kucukkoc and D. Z. Zhang, "Mixed-model parallel two-sided assembly line balancing problem: A flexible agent-based ant colony optimization approach, " Comput. Ind. Eng., vol. 97, 58-72, Jul. 2016. https://www.mendeley.com/research-papers/mixedmodel-parallel-twosided-assembly-line-balancing-problem-flexible-agentbased-ant-colony-optimiza/
[61] R. Pastor, "LB-ALBP: the lexicographic bottleneck assembly line balancing problem, " Int. J. Prod. Res., vol. 49, no. 8, pp. 2425-2442, Apr. 2011. https://www.mendeley.com/research-papers/lbalbp-lexicographic-bottleneck-assembly-line-balancing-problem/
[62] K. Buyukozkan, I. Kucukkoc, S. I. Satoglu, and D. Z. Zhang, "Lexicographic bottleneck mixed-model assembly line balancing problem: Artificial bee colony and tabu search approaches with optimised parameters, " Expert Syst. Appl., vol. 50, pp. 151-166, May 2016. https://www.mendeley.com/research-papers/lexicographic-bottleneck-mixedmodel-assembly-line-balancing-problem-artificial-bee-colony-tabu-searc/
[63] L. Wester and M. Kilbridge, "The assembly line model-mix sequencing problem, " in Proc. 3rd Int. Conf. Operation Research, Oslo, Norway, 1964, pp. 247-260.
[64] A. Bolat, "A mathematical model for selecting mixed models with due dates, " Int. J. Prod. Res., vol. 41, no. 5, pp. 897-918, 2003. doi: 10.1080/00207540210163892
[65] T. Volling and T. S. Spengler, "Modeling and simulation of order-driven planning policies in build-to-order automobile production, " Int. J. Prod. Econ., vol. 131, no. 1, pp. 183-193, May 2011. https://www.mendeley.com/research-papers/modeling-simulation-orderdriven-planning-policies-buildtoorder-automobile-production/
[66] J. Dörmer, H. O. Günther, and R. Gujjula, "Master production scheduling and sequencing at mixed-model assembly lines in the automotive industry, " Flex. Serv. Manuf. J., vol. 27, no. 1, pp. 1-29, Mar. 2015. https://www.mendeley.com/research-papers/master-production-scheduling-sequencing-mixedmodel-assembly-lines-automotive-industry/
[67] N. Manavizadeh, A. H. Goodarzi, M. Rabbani, and F. Jolai, "Order acceptance/rejection policies in determining the sequence in mixed model assembly lines, " Appl. Math. Modell., vol. 37, no. 4, pp. 2531-2551, Feb. 2013.
[68] D. Karaboga, "An idea based on honey bee swarm for numerical optimization, " Tech. Rep. -TR06, Oct. 2005. https://www.mendeley.com/research-papers/idea-based-honey-bee-swarm-numerical-optimization/
[69] Q. Y. Dong, J. S. Lu, and Y. K. Gui, "Integrated optimization of production planning and scheduling in mixed model assembly line, " Proced. Eng., vol. 29, pp. 3340-3347, Jan. 2012. https://www.mendeley.com/research-papers/integrated-optimization-production-planning-scheduling-flexible-jobshop/
[70] Y. K. Kim, J. Y. Kim, and Y. Kim, "An endosymbiotic evolutionary algorithm for the integration of balancing and sequencing in mixed-model U-lines, " Eur. J. Oper. Res., vol. 168, no. 3, pp. 838-852, Feb. 2006. https://www.mendeley.com/research-papers/endosymbiotic-evolutionary-algorithm-integration-balancing-sequencing-mixedmodel-ulines/
[71] U. Özcan, T. Kellegöz, and B. Toklu, "A genetic algorithm for the stochastic mixed-model U-line balancing and sequencing problem, " Int. J. Prod. Res., vol. 49, no. 6, pp. 1605-1626, Mar. 2011. https://www.mendeley.com/research-papers/genetic-algorithm-stochastic-mixedmodel-uline-balancing-sequencing-problem/
[72] U. Özcan, H. Çerçioǧlu, H. Gökçen, and B. Toklu, "Balancing and sequencing of parallel mixed-model assembly lines, " Int. J. Prod. Res., vol. 48, no. 17, pp. 5089-5113, Sep. 2010. https://www.mendeley.com/research-papers/balancing-sequencing-parallel-mixedmodel-assembly-lines/
[73] I. Kucukkoc and D. Z. Zhang, "Simultaneous balancing and sequencing of mixed-model parallel two-sided assembly lines, " Int. J. Prod. Res., vol. 52, no. 12, pp. 3665-3687, Jan. 2014. https://www.mendeley.com/research-papers/balancing-mixedmodel-parallel-twosided-assembly-lines/
[74] I. Kucukkoc and D. Z. Zhang, "Mathematical model and agent based solution approach for the simultaneous balancing and sequencing of mixed-model parallel two-sided assembly lines, " Int. J. Prod. Econ., vol. 158, pp. 314-333, Dec. 2014. https://www.mendeley.com/research-papers/mathematical-model-agent-based-solution-approach-simultaneous-balancing-sequencing-mixedmodel-parall/
[75] I. Kucukkoc and D. Z. Zhang, "Balancing of mixed-model parallel U-shaped assembly lines considering model sequences, " Int. J. Prod. Res., vol. 55, no. 20, pp. 5958-5975, Apr. 2017. doi: 10.1080/00207543.2017.1312586.
[76] J. H. Lee, H. J. Kim, and T. E. Lee, "Scheduling cluster tools for concurrent processing of two wafer types, " IEEE Trans. Autom. Sci. Eng., vol. 11, no. 2, pp. 525-536, Apr. 2014.
[77] R. M. Mahoney, High-Mix Low-Volume Manufacturing. Loveland, Colorado, USA:Hewlett-Packard Company, 1997.
[78] T. J. Chua, T. X. Cai, and J. M. W. Low, "Dynamic operations and manpower scheduling for high-mix, low-volume manufacturing, " in Proc. 2008 IEEE Int. Conf. Emerging Technologies and Factory Automation, Hamburg, Germany, 2008.
[79] P. Pandian, L. Yang, and X. Y. Liu. "Lean transformation for high mix low volume production:a case study, " in Proc. 2010 Industrial Engineering Research Conf., Cancun, Mexico, 2010. http://www.mendeley.com/research/lean-transformation-high-mix-low-volume-production-case-study/
[80] O. Rose, "Development and introduction of a combined dispatching policy at a high-mix low-volume ASIC facility, " in Proc. 2012 Winter Simulation Conf. (WSC), Berlin, Germany, 2012.
[81] K. Yoshida, T. Sato, T. Kono, E. Yamanaka, M. Kariya, A. Inoue, and S. Mimotogi, "Virtual lithography system to improve the productivity of high-mix low-volume production, " in Proc. SPIE, Japan, vol. 6607, 2007.
[82] Y. F. Peng, Z. L. Guan, L. Ma, C. Y. Zhang, and P. G. Li, "A mathematical programming method for flow path design in high-mix and low-volume flow manufacturing, " in Proc. IEEE Int. Conf. Industrial Engineering and Engineering Management, Singapore, 2008. https://www.mendeley.com/research-papers/mathematical-programming-method-flow-path-design-highmix-lowvolume-flow-manufacturing/
[83] A. Ali, H. Seifoddini, and J. Lee, "Efficient material allocations in high-mix low-volume manufacturing, " J. Adv. Manuf. Syst., vol. 9, no. 2, pp. 101-116, Feb. 2010. http://www.mendeley.com/research/efficient-material-allocations-highmix-lowvolume-manufacturing/
[84] R. Fritsche, "Reducing set-up times for improved flexibility in high-mix low-volume electric drives production, " in Proc. 1st Int. Electric Drives Production Conf. (EDPC), Nuremberg, Germany, 2011. https://www.mendeley.com/research-papers/reducing-setup-times-improved-flexibility-highmix-lowvolume-electric-drives-production/
[85] J. Svancara and Z. Kralova, "High-mix low-volume flow shop manufacturing system scheduling, " IFAC Proc. Vol., vol. 45, no. 6, pp. 145-150, May 2012. https://www.mendeley.com/research-papers/highmix-lowvolume-flow-shop-manufacturing-system-scheduling/
[86] F. Bohnen, T. Maschek, and J. Deuse, "Leveling of low volume and high mix production based on a group technology approach, " CIRP J. Manuf. Sci. Technol., vol. 4, no. 3, pp. 247-251, Jan. 2011. https://www.mendeley.com/research-papers/leveling-low-volume-high-mix-production-based-group-technology-approach/
[87] F. Bohnen, M. Buhl, and J. Deuse, "Systematic procedure for leveling of low volume and high mix production, " CIRP J. Manuf. Sci. Technol., vol. 6, no. 1, pp. 53-58, Dec. 2013. https://www.mendeley.com/research-papers/systematic-procedure-leveling-low-volume-high-mix-production/
[88] V. A. Raghavan, S. Yoon and K. Srihari, "Lean transformation in a high mix low volume electronics assembly environment, " Int. J. Lean Six Sigma, vol. 5, no. 4, pp. 342-360, Oct. 2014. https://www.mendeley.com/research-papers/lean-transformation-high-mix-low-volume-electronics-assembly-environment/
[89] J. H. Lee, H. J. Kim, and T. E. Lee, "Scheduling lot switching operations for cluster tools, " IEEE Trans. Semicond. Manuf., vol. 26, no. 4, pp. 592-601, Apr. 2013.
[90] J. H. Lee and H. J. Kim, "Makespan analysis of lot switching period in cluster tools, " IEEE Trans. Semicond. Manuf., vol. 29, no. 2, pp. 127-136, May 2016.
[91] H. J. Kim, J. H. Lee, and T. E. Lee, "Schedulability analysis for noncyclic operation of time-constrained cluster tools with time variation, " IEEE Trans. Autom. Sci. Eng., vol. 13, no. 3, pp. 1409-1414, Jul. 2016. https://www.mendeley.com/research-papers/schedulability-analysis-noncyclic-operation-timeconstrained-cluster-tools-time-variation/
[92] H. J. Kim, J. H. Lee, and T. E. Lee, "Noncyclic scheduling of cluster tools with a branch and bound algorithm, " IEEE Trans. Autom. Sci. Eng., vol. 12, no. 2, pp. 690-700, Apr. 2015.
[93] Y. Qiao, M. C. Zhou, N. Q. Wu, and Q. H. Zhu, "Scheduling and control of startup process for single-arm cluster tools with residency time constraints, " IEEE Trans. Control Syst. Technol., vol. 25, no. 4, pp. 1243-1256, Jul. 2017. https://www.mendeley.com/research-papers/scheduling-control-startup-process-singlearm-cluster-tools-residency-time-constraints/
[94] Q. H. Zhu, M. C. Zhou, Y. Qiao, and N. Q. Wu, "Petri net modeling and scheduling of a close-down process for time-constrained single-arm cluster tools, " IEEE Trans. Syst. Man Cybern. Syst., 2016. doi: 10.1109/TSMC.2016.2598303.
[95] S. Ware and R. Su, "An application of incremental scheduling to a cluster photolithography tool, " in Pro. 2017 IFAC World Congress, Toulouse, France, vol. 50, no. 1, pp. 1114-1120. https://www.mendeley.com/research-papers/application-incremental-scheduling-cluster-photolithography-tool/
[96] S. C. Neoh, N. Morad, C. P. Lim, and Z. A. Aziz, "A layered-encoding cascade optimization approach to product-mix planning in high-mix-low-volume manufacturing, " IEEE Trans. Syst. Man Cybern. Part A Syst. Humans, vol. 40, no. 1, pp. 133-146, Jan. 2010. https://www.mendeley.com/research-papers/layeredencoding-cascade-optimization-approach-productmix-planning-highmixlowvolume-manufacturing/
[97] Y. K. Park and J. M. Yang, "Scheduling of die casting operations including high-mix low-volume and line-type production, " Int. J. Prod. Res., vol. 51, no. 6, pp. 1728-1744, Jan. 2013. https://www.mendeley.com/research-papers/scheduling-die-casting-operations-including-highmix-lowvolume-linetype-production/
[98] A. B. Said, M. K. Shahzad, E. Zamai, S. Hubac, and M. Tollenaere, "Experts' knowledge renewal and maintenance actions effectiveness in high-mix low-volume industries, using Bayesian approach, " Cogn. Technol. Work, vol. 18, no. 1, Feb. 2016. http://hal.univ-savoie.fr/INPG/hal-01201796
[99] M. M. Srinivasan and S. Viswanathan, "Optimal work-in-process inventory levels for high-variety, low-volume manufacturing systems, " ⅡE Trans., vol. 42, no. 6, pp. 379-391, Mar. 2010. http://www.mendeley.com/catalog/optimal-workinprocess-inventory-levels-highvariety-lowvolume-manufacturing-systems/
[100] Y. S. Tan, T. B. Tjandra, and B. Song, "Energy efficiency benchmarking methodology for mass and high-mix low-volume productions, " Proced. CIRP, vol. 29, pp. 120-125, Dec. 2015. https://www.mendeley.com/research-papers/energy-efficiency-benchmarking-methodology-mass-highmix-lowvolume-productions/
[101] J. M. J. Becker, J. Borst, and A. van der Veen, "Improving the overall equipment effectiveness in high-mix-low-volume manufacturing environments, " CIRP Ann., vol. 64, no. 1, pp. 419-422, May 2015.
[102] S. Nakajima, TPM Development Program:Implementing Total Productive Maintenance. Cambridge, MA, USA:Productivity Press, 1989.
[103] A. Jain, P. K. Jain, F. T. S. Chan, and S. Singh, "A review on manufacturing flexibility, " Int. J. of Prod. Res., vol. 51, no. 19, pp. 5946-5970, Oct. 2013.